PUWER vs LOLER: which rules apply to your plant?

Last reviewed

PUWER and LOLER are the two sets of regulations that most often decide what checks your plant needs and what paperwork goes with it. They aren’t alternatives. PUWER covers all work equipment, and LOLER adds extra requirements for lifting equipment, so a crane, a telehandler or a lorry loader has to meet both.

PUWER: all work equipment

The Provision and Use of Work Equipment Regulations 1998 (PUWER) apply to any machinery, appliance, apparatus, tool or installation used at work, so the scope is very wide. The duties fall on employers and on anyone who owns, operates or has control of work equipment. In summary, equipment must be:

  • suitable for what it’s used for
  • safe to use, maintained in a safe condition and, where necessary, inspected
  • used only by people who have had adequate information, instruction and training
  • fitted with suitable protective devices and controls, such as guards and emergency stops

PUWER also has specific requirements for mobile work equipment. HSE’s detailed guidance is L22.

LOLER: lifting equipment

The Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) apply to work equipment for lifting or lowering loads and to lifting accessories such as chains and slings. HSE puts it simply: lifting equipment must also meet the requirements of LOLER. On top of PUWER, lifting equipment must be strong and stable enough for its use, marked with its safe working load, used in lifting operations that are properly planned, supervised and carried out safely, and thoroughly examined by a competent person. HSE’s detailed guidance is L113.

Side by side

PUWERLOLER
CoversAll work equipmentLifting equipment and lifting accessories, in addition to PUWER
Formal checkInspection, where safety depends on how the equipment is installed or it’s exposed to conditions that cause dangerous deteriorationThorough examination by a competent person, with inspections in between where appropriate
How oftenAfter installation, at suitable intervals, and after exceptional circumstancesBefore first use, after installation, at least every 6 months (accessories and equipment for lifting people) or 12 months (other lifting equipment) or under an examination scheme, and after exceptional circumstances
ResultInspection recorded, and kept until the next inspection is recordedWritten report, kept for set periods
When it leaves your businessMust be accompanied by physical evidence of the last inspection (regulation 6(4))Must be accompanied by physical evidence of the last thorough examination (regulation 9(4))

PUWER’s inspection regulation doesn’t apply to work equipment for lifting loads, because LOLER’s thorough examination regime covers it. The rest of PUWER still applies to lifting equipment.

Machines that fall under both

Take a telehandler. As a mobile machine it must meet PUWER: it has to be suitable for the job, maintained, fitted with the right protective devices and used only by trained operators. Because it lifts loads, LOLER applies too: its lifting function needs thorough examinations and reports, its safe working load must be marked, and each lift must be properly planned.

An excavator is similar. Used only for digging, it’s work equipment under PUWER. Used to lift loads, for example pipes on chains, it’s being used as lifting equipment, so LOLER’s requirements apply to it and to the accessories used with it.

Which certificates to keep with the machine

For most plant, that means the latest of each of these, where they apply:

  • the LOLER thorough examination report, for anything used for lifting, and its lifting accessories
  • the record of the last PUWER inspection, where the equipment needs inspecting
  • anything else your customers or sites ask for, such as service records or insurance

With Safe Cert, all of them sit behind one QR code on the machine, and each is replaced as soon as you upload its renewal. See how hire companies use it, or read our guide to LOLER thorough examinations.

Keep every report where it’s needed

Safe Cert puts the latest certificate on each machine as a QR code, so anyone on site can check it in seconds.